Comparison 2025

LGSF vs. Timber Construction
vs. Masonry House

Clear comparison of cost, speed, and quality of construction for investors, architects, and builders.

Did you know? LGSF and timber construction are so-called dry construction methods – after assembling the skeleton and insulation, they proceed directly to finishing. Masonry construction requires plastering, chasing, and weeks of drying additionally.

LGSF (Skymax)
Timber construction
Masonry construction
Parameter LGSF – Skymax Timber construction Masonry construction
Construction Cost
Skeleton / Shell Phase (CZK/m²)
~4,500–6,500 CZK lowest cost
8,000–12,000 CZK
9,000–14,000 CZK
Turnkey House (CZK/m²)
38,000–48,000 CZK savings
45,000–58,000 CZK
50,000–65,000 CZK
Foundation Costs
Low
Low
High
Construction speed
Skeleton Assembly
2–6 weeks fastest
4–10 weeks
3–5 months
Turnkey House
4–7 months
6–9 months
12–16 months
Weather Dependency
Minimal
Low
High
Structure and Material
Structural weight
Very low
Low
High
Dimensional stability over time
Excellent
Good*
Excellent
Resistance to pests and mold
Excellent
Medium
Excellent
Material recyclability
100% steel
High
Partial
Construction and finishing
Building type
Dry construction
Dry construction
Wet construction
Plastering / wet processes
Not required
Not required
Required
Grooving for installations
Installations within profiles
Built into the structure
Wall grooving
Manufacturing accuracy
CNC – mm precision
High
Dependent on craftsmanship
Energy performance and durability
Achievable energy standard
Low-energy / Passive
Low-energy / Passive
Low-energy / Passive
Thermal bridge minimization
Excellent*
Excellent
Medium
Structural lifespan
50+ years
50–80 years
80–100+ years

* LGSF: thermal bridges can be eliminated by interrupted profiles or external insulation. Wood: with proper processing and maintenance. Prices are indicative (Czech market 2025), excluding VAT.

Cost – rough construction phase

Indicative range CZK/m² (Czech Republic, 2025)

Cost – turnkey house

Indicative range CZK/m² (Czech Republic, 2025)

Skeleton construction speed

Weeks to closed skeleton

Total turnkey construction time

Number of months (average)

Prices are indicative averages of the Czech market 2025. LGSF rough phase = skeleton + assembly (Skymax Living material). Other technologies: average supplier offers.

LGSF – Skymax

After skeleton assembly

  • Load-bearing steel structure completed
  • Roof trusses installed
  • Installations routed inside the profile
  • Blow in / insert insulation
  • Internal sheathing (Plasterboard/OSB)
  • Facade / ventilated cladding
Timber construction

After skeleton assembly

  • Wooden frame / CLT panels completed
  • Vapor barrier and OSB boards
  • Windows installed (structure protection)
  • Insulation in panels / mineral wool
  • Internal sheathing (Plasterboard)
  • Facade / ventilated cladding
Masonry construction

After completion of the shell construction

  • Load-bearing masonry built
  • Ceilings and roof structure completed
  • Internal plastering (wet process)
  • Plaster drying – weeks!
  • Wall chasing for electrical/plumbing
  • External plaster or facade
  • ETICS or ventilated facade

Key insight: LGSF ≈ Timber construction

Both technologies are so-called dry construction methods. After skeleton assembly and insulation, the process moves directly to sheathing and facade – no waiting for plaster drying, no chasing. Compared to masonry construction, you save weeks of work and eliminate moisture risks in the structure. Masonry requires wet processes that extend the schedule and increase the risk of mold formation due to insufficient drying.

2–6
weeks for the skeleton

LGSF – Skymax

CNC production in the hall, assembly of prefabricated panels on site. Turnkey house: 4–7 months.
4–10
weeks for the skeleton

Timber construction

Prefabricated panels or system construction. Turnkey house: 6–9 months.
3–5
months for shell construction

Masonry construction

Traditional masonry, wet processes, drying. Turnkey house: 12–16 months.

Comparison of total turnkey construction time

Average duration in months (Czech Republic, 2025)

What does this mean for the investor?

Shorter construction time = faster return on investment. For a development project with 10 houses, a 6–9 month difference compared to masonry construction represents a real savings on financing and earlier cash flow. LGSF also minimizes the risk of material or labor cost increases during construction thanks to precise pre-manufacturing.

Request an exact quote

We will prepare a non-binding offer for the LGSF structure according to your project. We will respond within 2 business days.